Designing and deploying the network for an Australian fashion brand’s new warehouse, from the central cabinet and structured cabling through to inter-site connectivity and 50 wireless access points.

50 access pointsCabled across warehouse floor
Site-to-site VPNWarehouse to main office
One cabinetStructured central termination

Build the network as part of the warehouse, not after it opened.

The new facility needed a complete connectivity layer for warehouse operations and a secure link back to the company’s main office. Physical installation, logical design and inter-site connectivity were delivered as one project.

01 / Facility

Greenfield network

The warehouse required new network infrastructure rather than an upgrade to an existing environment, making early design and installation coordination essential.

02 / Coverage

Fifty cabled access points

Wireless access points were distributed across the warehouse floor and cabled back to the central network cabinet with industry-compliant terminations.

03 / Connectivity

Secure inter-site link

A site-to-site VPN connected the warehouse with the main office, extending business connectivity between the two locations.

Architecture & delivery

Physical and logical infrastructure resolved together.

A warehouse network depends on more than selecting access points. Cabinet layout, cable paths, terminations, switching, security and upstream connectivity all need to support the operating environment.

01

Site and requirement assessment

Defined the network requirements for the new warehouse, including floor coverage and connectivity back to the main office.

02

Network architecture

Designed the cabinet-centred topology and the switching, firewall, wireless and inter-site components required by the facility.

03

Structured cabling

Ran cabling for 50 access-point locations across the warehouse floor, returning each service to the central network cabinet.

04

Cabinet and termination

Completed industry-compliant terminations and organised the physical network layer around a maintainable cabinet installation.

05

Inter-site VPN

Established a site-to-site VPN between the warehouse and main office to support secure business connectivity across locations.

Delivery coordinated from design through commissioning.

The project sequence connected building works and physical installation with the configuration required to place the warehouse network into production.

01 / Design

Resolve the topology

Establish equipment locations, cable paths, cabinet requirements and the connection to the main office.

02 / Install

Build the physical layer

Deploy structured cabling, terminations and the cabinet infrastructure supporting the warehouse floor.

03 / Configure

Establish network services

Configure the switching, wireless, firewall and site-to-site connectivity required for operation.

04 / Commission

Bring the site online

Validate the deployed network and transition the new warehouse onto its production connectivity.

Delivered outcome50 APs
1 site

A complete network foundation installed for the new warehouse.

A warehouse connected internally and back to the wider business.

The new facility received a structured network deployment spanning the cabinet, cabling, wireless layer and inter-site connection.

Fifty access points were cabled across the warehouse floor, with compliant terminations brought back to the network cabinet. The site-to-site VPN connected the warehouse to the main office as part of the production design.

  • Greenfield warehouse network
  • Fifty cabled wireless access points
  • Central network cabinet
  • Site-to-site VPN to head office

Related case studies.

Network infrastructure often supports the endpoint, cloud and operational systems used across a growing business.

Design before installation

Planning a new site or network upgrade?

Resolve the physical topology, security boundaries and connectivity requirements before equipment arrives.

Discuss your network project